Odor Control Planning and Design

Wichita Falls, Texas

Perkins Engineering Consultants, Inc. was retained by the City of Wichita Falls to perform and odor source assessment and to develop an odor control master plan for the City’s 19.5 MGD River Road Wastewater Treatment Plant. PEC assisted with design of the first phase of odor abatement improvements, which includes primary clarifier weir covers, junction structure covers, corrosion repairs and a 7500 CFM foul air collection system. Construction was completed in fall of 2008.